Bernold, L E, Lorenc, S J and Davis, M L (2001) Technological Intervention to Eliminate Back Injury Risks for Nailing. Journal of Construction Engineering and Management, 127(03), 245–50.

Chang, L and Chen, P (2001) BOT Financial Model: Taiwan High Speed Rail Case. Journal of Construction Engineering and Management, 127(03), 214–22.

El-Rayes, K (2001) Object-Oriented Model for Repetitive Construction Scheduling. Journal of Construction Engineering and Management, 127(03), 199–205.

El-Razek, M E A and Basha, I M (2001) Constructability Improvement of Bridges Using Stepping Formwork. Journal of Construction Engineering and Management, 127(03), 206–13.

  • Type: Journal Article
  • Keywords:
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)0733-9364(2001)127:3(206)
  • Abstract:
    Many construction systems have been used to build several highway bridges and elevated roads in Egypt. Recently, the stepping shuttering system has been used in Egypt for cast-in-place concrete bridge. This system is most appropriate for concrete bridges of moderate spans ranging from 40 to 70 m. The stepping shuttering system provides appropriate means to satisfy local needs for concrete bridge construction in an urban environment, practically without infringing on traffic or property below. This paper presents an innovative method of construction that has been used in Egypt for the first time to build the 6th October Bridge extension. Issues regarding the constructability and innovation are highlighted, and the significant aspects during the bridge construction are documented. Also, the difficulties encountered and the lessons learned are thoroughly investigated. In addition, evaluation of the system is discussed in terms of construction cost, schedule, and flexibility. Finally, this paper presents an innovative method that offers substantial opportunity for enhancing constructability of concrete bridges using the stepping shuttering system.

Hegazy, T and Wassef, N (2001) Cost Optimization in Projects with Repetitive Nonserial Activities. Journal of Construction Engineering and Management, 127(03), 183–91.

Hiyassat, M A S (2001) Applying Modified Minimum Moment Method to Multiple Resource Leveling. Journal of Construction Engineering and Management, 127(03), 192–8.

Kangari, R and Bakheet, M (2001) Construction Surety Bonding. Journal of Construction Engineering and Management, 127(03), 232–8.

Mitropoulos, P and Howell, G (2001) Model for Understanding, Preventing, and Resolving Project Disputes. Journal of Construction Engineering and Management, 127(03), 223–31.

Moua, B and Russell, J S (2001) Comparison of Two Maintainability Programs. Journal of Construction Engineering and Management, 127(03), 239–44.

Oberlender, G D and Trost, S M (2001) Predicting Accuracy of Early Cost Estimates Based on Estimate Quality. Journal of Construction Engineering and Management, 127(03), 173–82.